FAILDEX失樂園
中文

QBotix

The business, the turning points, and the decisions behind them.

Founded2010
Event year2015
FundingUS$23.5M
Cash burnedUS$41.5M
Some sections are still being researched2 / 4

Sections to complete:02 · 05

01 / WHAT IT BUILT

What the company did

QBotix was a Menlo Park, California robotics startup founded in 2010 by Wasiq Bokhari. It built the QBotix Tracking System (QTS/RTS): a dual-axis solar tracking system that consolidated the drive mechanisms of 200 trackers (~300 kW) into one or two rail-mounted 'SolBot' robots that traveled along a monorail adjusting each panel every 40 minutes - claiming up to 45% more energy than fixed mounts and up to 15% more than single-axis trackers, at comparable cost to single-axis. It raised $23.5 million, including a $12 million Series B in May 2014 from E.ON and Iberdrola (joined by NEA, Firelake, Draper Nexus, Siemens Ventures), and held over 80 MW of projects under contract by July 2014.

02 / FAILURE REASONS

Pending assessment

Material for this section is being gathered and checked. It will appear here once ready.

03 / EVENT HISTORY

Events in the structured record

  1. Founded

    Wasiq Bokhari founded QBotix in Menlo Park, CA, developing the SolBot robotic solar tracking system.

  2. First commercial deployment

    First commercial system deployed at Alameda County's Santa Rita Jail in Dublin, CA (32 trackers + one SolBot, ~120,000 kWh/year).

  3. Momentum peak

    Won a 45 MW supply contract with UK's Castillium; raised $12M Series B from E.ON and Iberdrola; over 80 MW under contract globally; new CEO Mike Miskovsky appointed.

  4. Shut down

    QBotix shut down in 2015; no public account of the closure's causes was found.

04 / CONTEMPORARY REBUILD ASSESSMENT

Difficulty of rebuilding this project today

Material for this section is being gathered and checked. It will appear here once ready.

Rebuild difficultyPending assessmentNot completed
Scoring basisNot completed
ScalabilityPending assessmentNot completed
Scoring basisNot completed

Overall assessment: Not completed

05 / CAUSAL CHAIN / AFTERMATH

Pending assessment

Material for this section is being gathered and checked. It will appear here once ready.