Powin Energy

The business, the turning points, and the decisions behind them.

Founded2011
Event year2025
FundingUS$400M
Cash burnedUS$400M

01 / WHAT IT BUILT

What the company did

Powin Energy was a Portland, Oregon-based battery energy storage integrator founded in 2011. It engineered and installed utility-scale battery energy storage systems under Energy Supply Agreements and serviced them through long-term service agreements, operating in Vietnam, China, Canada, Australia and Spain. By 2023 it had more than 17 GWh of projects deployed or under construction, and had raised about $400 million.

02 / Powin Energy FAILURE REASONS

Failure reasons

Powin filed for Chapter 11 citing severe liquidity constraints, an extreme overdependence on trade credit, mounting customer claims for liquidated damages over alleged performance delays, and damaged credibility with customers. Chinese manufacturers' competition, US tariff and regulatory pressure on Chinese battery supply chains, and capital-intensity across the storage sector squeezed its balance sheet even as demand for storage grew. A $200 million KKR-backed revolving credit facility secured in 2023 could not prevent the downturn.

03 / EVENT HISTORY

Events in the structured record

  1. Founded

    Powin Energy founded in Portland, Oregon (record year 2011; some industry sources cite 2016).

  2. Scale and credit facility

    Powin reported 17+ GWh of projects deployed or under construction and secured a $200 million revolving credit facility backed by KKR-managed insurance funds.

  3. Chapter 11 filing

    On June 10, 2025 Powin filed for Chapter 11 protection in New Jersey, citing liquidity constraints and trade-credit dependence; it warned of nearly 250 layoffs under the WARN Act. FlexGen bid to acquire its assets during proceedings.

  4. Liquidation plan

    In October 2025 Powin filed a joint Chapter 11 liquidation plan after $54 million in asset sales, with an estimated $300 million in unsecured debt.

04 / CONTEMPORARY REBUILD ASSESSMENT

Difficulty of rebuilding this project today

Material for this section is being gathered and checked. It will appear here once ready.

Rebuild difficultyPending assessmentNot completed
Scoring basisNot completed
ScalabilityPending assessmentNot completed
Scoring basisNot completed

Overall assessment: Not completed

05 / AFTERMATH

Aftermath and lessons

Powin's collapse became part of a 2025 clean-energy liquidity crisis wave, alongside Sunnova's Chapter 11 filing and Northvolt's bankruptcy. Its assets were acquired by rival FlexGen. The case showed that even leading integrators with 17 GWh of pipeline could be undone by trade-credit dependence, project delays and geopolitical supply-chain pressure.